PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Compactig soil at foundation walls Facing East c.l. 2.5 (800x600).jpg Lifting Slip forms at Elev. 4-Stair -2 to 3rd floor Facing South (800x600).jpg Lifting Slip forms at Elev. 5,6 to 3rd floor Facing South (800x600).jpg Lifting Slip forms at Elev. 1,2,3 to 3rd floor Facing South (800x600).jpg Lifting the slip forms at Elev. 4,5 3rd floor Facing South-East (800x600).jpg Lifting the slip forms at Elev. 4-Stair -2 3rd floor Facing South (800x600).jpg Stripped foundation walls at Elev. 7-Stair 4,5 Facing South (800x600).jpg Stripped foundation walls at Elev. 7-Stair 4,5 Facing South-East (800x600).jpg
Previous pageNext page Lifting Slip forms at Elev. 1,2,3 to 3rd floor Facing South (800x600)
Lifting Slip forms at Elev. 1,2,3 to 3rd floor Facing South (800x600)